Personal tools

Search results

From iis-projects

Jump to: navigation, search
  • UE. However, this task is not a trivial one in an environment such as that of the TD-HSPA standard (deplo
    2 KB (265 words) - 13:49, 9 February 2015
  • ...ng blocks that were mostly ad-hoc targeting some specific examples and did not consider well-understood complete platforms based on these inexact and extr
    4 KB (568 words) - 12:48, 9 February 2015
  • ...g order of magnitude less power than in active mode, and this allows to do not waste precious energy. However, it is important to implement mechanisms an ===Status: Available ===
    3 KB (515 words) - 19:55, 9 February 2015
  • ==Available Projects== There are several projects currently available, which are listed in this section. Most of them can be adapted to a Masters
    2 KB (336 words) - 17:27, 1 November 2017
  • ...many years, it hasn't found its way into EDA. Current synthesis tools are not able to report nor optimize glitching. As a result glitching power goes mai [[Category:Available]]
    2 KB (330 words) - 15:59, 14 September 2017
  • ...three spectral bins (red, green, blue), but many more (e.g. 16 or 25) and not necessarily in the visual range of the spectrum. This allows the camera to ...rovide a large number of channels and were very heavy, ultra expensive and not mobile [[http://www.helimetrex.com.au/tetra.html link], [http://www.fluxdat
    6 KB (941 words) - 11:29, 5 February 2016
  • If you want to work on this project, but you think that you do not match some the required skills, we can give you some preliminary exercise t [[Category:Available]]
    5 KB (784 words) - 14:50, 30 November 2016
  • ...ation in the source contact of III-V MOSFETs and of determining whether or not source starvation plays a significant role. ===Status: Available ===
    3 KB (331 words) - 15:40, 4 September 2019
  • ...eld-effect transistors (MOSFETs), the sub-threshold slope (SS) of TFETs is not limited to 60 mV/dec at room temperature, but could theoretically be reduce ===Status: Available ===
    3 KB (357 words) - 15:38, 4 September 2019
  • ...rm can be treated using Ewald's summation method in bulk structures, it is not clear how to handle it in nanostructures without too much increasing the co ===Status: Available ===
    3 KB (363 words) - 15:37, 4 September 2019
  • ...ntal measurements, but could also be used to predict the behaviour of new, not-yet-fabricated devices. ===Status: Available ===
    4 KB (488 words) - 17:12, 16 September 2021
  • ...ements, but could also be used to predict the behavior of new, not-yet-fabricated devices. ===Status: Available ===
    3 KB (448 words) - 17:11, 16 September 2021
  • ...y 20 dB. For the so-called PBCH this is especially difficult, since it has not been changed from legacy LTE. While it is transmitted continuously, the dat ===Status: Available ===
    3 KB (345 words) - 10:52, 5 April 2022
  • ...IIS we have started developing our own implementation of the OpenRISC core available from the [http://www.opencores.org Opencores] community. A brand new optimi At the moment, the processor does not have a working interrupt system. We expect this support to be present at th
    4 KB (667 words) - 15:23, 23 December 2016
  • ...ny core system. However, the performance of the software implementation is not sufficient to fulfill the real-time requirements of the system. Therefore w ===Status: Available ===
    3 KB (456 words) - 08:35, 20 January 2021
  • in case the transmitter and receiver are not synchronized. Strongly available at all times. Therefore, the BTS transmits synchronization
    2 KB (350 words) - 17:56, 14 April 2016
  • Reliability (R(t)) is the probability that a given system does not fail before time t. It is becoming a major concern in modern multiprocessor ===Status: Available ===
    4 KB (573 words) - 17:24, 9 February 2015
  • ...obstacle when public places are being monitored: real-time surveillance is not allowed in such cases, and stored data can (even for internal use) only be ===Status: Available ===
    3 KB (408 words) - 13:17, 5 February 2016
  • ...support before synthesis in order to save silicon area if Evolved EDGE is not required. The transmitter will eventually replace the transmitter in the ex
    3 KB (384 words) - 16:41, 17 July 2016
  • ...obstacle when public places are being monitored: real-time surveillance is not allowed in such cases, and stored data can (even for internal use) only be * project report (in digital form; a hard copy also welcome, but not necessary)
    9 KB (1,289 words) - 19:45, 24 March 2015
  • ===Status: Available === (''not all need to be met'' by the single candidate)
    4 KB (589 words) - 10:14, 3 August 2018
  • Today, most commercially available 3D display Ideally, a 3D display system should not require the users to
    3 KB (509 words) - 09:09, 23 October 2015
  • ...ery tight power budget. Without a dedicated accelerator, these tasks would not be feasible. ===Available Projects===
    2 KB (275 words) - 17:05, 24 November 2023
  • [[Category:Available]] == Status: Available ==
    4 KB (520 words) - 15:15, 4 December 2023
  • ===Status: Available === : First experiences with GPU Programming (CUDA) are beneficial but not required
    3 KB (428 words) - 12:13, 1 August 2018
  • [[File:2G_soc.png|thumb|Vision of modem SoC (external power amplifier not shown). The bold interfaces can be implemented during this project.]] File:2G_soc.png|Vision of modem SoC (external power amplifier not shown). The bold interfaces can be implemented during this project.
    7 KB (1,105 words) - 20:02, 26 September 2017
  • ...networks is usually to get a large enough, (hand-)labeled dataset. This is not a problem here, since we can take a high-quality algorithm's output as our * Implement the most promissing candidate(s) (or make use of available implementations)
    5 KB (707 words) - 11:22, 5 February 2016
  • ===Status: Not Available === [[Category:Available]]
    5 KB (716 words) - 13:43, 29 November 2019
  • architectures has already been around for decades, but so far it has not been viable on an industrial scale. Recent developments in process technolo
    3 KB (443 words) - 13:10, 2 November 2015
  • * project report (in digital form; a hard copy also welcome, but not necessary) * two not-yet-published papers by our group on acceleration of ConvNets
    8 KB (1,145 words) - 11:30, 5 February 2016
  • * project report (in digital form; a hard copy also welcome, but not necessary) * two not-yet-published papers by our group on acceleration of ConvNets
    8 KB (1,197 words) - 18:18, 29 August 2016
  • ...e phone and the base station is no trivial task. Initially the mobile does not know anything about the base-station. It does not know when the different frames start, what cells are around and which synch
    3 KB (420 words) - 11:22, 14 April 2016
  • (''not all need to be met'' by the single candidate) ...ioning with operational amplifiers: amplifiers, filters, integrators etc. (not mandatory)
    6 KB (774 words) - 08:36, 23 November 2022
  • ...sult in a temperature independent voltage of about 1.2V. Such a voltage is not compliant with modern CMOS processes that have supply voltages below 1V. En [[Category:Available]]
    4 KB (471 words) - 11:13, 3 May 2018
  • ...1.0. However, it has been superseded by the [[evaLTE]] board, which offers not only 2G but also 3G and 4G transceiver functionality.
    2 KB (289 words) - 17:10, 17 December 2015
  • ...ect will be implement and evaluate a complete neural network using already available framework to achieve context recognition. The idea behind this project woul ===Status: Available ===
    4 KB (507 words) - 12:11, 16 February 2016
  • ...g. sampling frequency) sufficient for the particular application, in order not to miss the event. However, the rate of occurrence of the event of interes ===Status: Available ===
    7 KB (895 words) - 17:02, 28 July 2017
  • ==Available Projects== category = Available
    2 KB (310 words) - 17:41, 31 August 2016
  • * project report (in digital form; a hard copy also welcome, but not necessary) * two not-yet-published papers by our group on acceleration of ConvNets
    8 KB (1,176 words) - 16:26, 30 October 2020
  • ...n connected to a contact lens made of plaster-of-Paris. Obviously, this is not the most pleasant recording technique since it affects the eye and its move
    1 KB (146 words) - 17:43, 31 August 2016
  • ...good candidates for the communication interface. Whenever a power plug is not an option ultra long battery life is a key requirement. And, as the number ...at the institute in the [[stoneEDGE]] project. It combines a commercially available RF IC from ACP AG [1] and Digital Baseband (DBB) developed at the institute
    2 KB (299 words) - 17:58, 14 April 2016
  • ===Status: Available === (''not all need to be met'' by the single candidate)
    3 KB (388 words) - 11:06, 12 July 2017
  • ...rs and 9 billions of operations on a VGA image. The goal of the project is not only to have this state-of-the-art deep network running on a low-power embe [[Category:Available]]
    4 KB (593 words) - 14:57, 30 November 2016
  • ...ting is a well-established method to save power in circuit parts currently not in use in a system on chip (SoC). In contrast to clock gating, where the cl ...rator with no relevant information to be retained between two calls, it is not acceptable for an entire processor core idling, for example while waiting f
    2 KB (364 words) - 09:34, 25 July 2017
  • ...hat this project can deliver the most efficient ''small memory'' generator available to us, and beat the performance of what we can achieve with standard SRAM g * Familiarity with transistor level design is a plus, but is not necessary (i.e AIC)
    5 KB (769 words) - 15:54, 23 May 2018
  • ...ce aspect of this application is that the usually limited training data is not an issue, since randomly acquired images our the internet can be used to tr ===Status: {Available, Reserved, In Progress, Completed}===
    2 KB (285 words) - 18:16, 29 August 2016
  • ...vel lies above the noise level (10 dB SNR or higher). Lower SNR ranges are not interesting for normal communication. With the introduction of EC-GSM-IoT, ...um time to synchronize (successfully decode EC-SCH data) is 2 s. This does not mean that requirements R1a and R1b need to be met after 2 s, it only means
    4 KB (582 words) - 20:00, 26 September 2017
  • ...]] [[Category:Software]] [[Category:Digital]] [[Category:PULP]] [[Category:Available]] [[Category:Semester Thesis]] [[Category:Dpalossi]] The goal of the project is not only to achieve good performance in term of execution time, but also to fin
    4 KB (628 words) - 16:16, 20 February 2018
  • ...city. In some cases, due to very restrictive form factors, batteries might not even be a design option. In these scenarios, small energy harvesters can be ===Status: Available ===
    3 KB (413 words) - 15:21, 28 January 2016
  • * project report (in digital form; a hard copy also welcome, but not necessary) * two not-yet-published papers by our group on acceleration of ConvNets
    5 KB (747 words) - 18:04, 29 August 2016

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)